Kansanshi Mine
3.3kV Overhead Line — Muliashi South
Sub-contracted to construct and commission a 3.3kV overhead line of 1,885 metres in length.
Installation, termination and maintenance of high- and low-voltage equipment for industrial and mining environments — from overhead lines and switch yards to VSDs, MCCs, motors and optic-fibre cabling.
Kansanshi Mine
Sub-contracted to construct and commission a 3.3kV overhead line of 1,885 metres in length.
Kansanshi Mine
Installed two 150mm² 4-core armoured cables, glanded, lugged and terminated on the 250MVA transformer and EW2 substation for the main boiler workshop.
Kansanshi Mine
Installed Knelson Gravity and Falcon concentrators, power & control cables for 355kW motors, VSDs and chokes, plus HMI control boards.
Kansanshi Mine
Electrified the metallurgical and analytical laboratories and offices — powering and commissioning drying ovens, shakers, mixers and separators.
First Quantum (FQMO)
Installed lighting along the haul road from the main pit to the crusher, and wired boiler, drills and WHBO workshops.
Kansanshi Mine
Construction of electrical cable racks, installation of electrical and optic-fibre cables, VSD glanding & termination, and 40-metre tower light assembly.
From high-voltage installations to air-conditioning and civil works, our teams deliver quality, on time and to standard. Tell us what you need — we'll respond within one business day.